Critical Path Traversal Vulnerability in Check Point Security Gateways (CVE-2024-24919)


The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.

Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.

Read more…
Source: Sonicwall


Sign up for our Newsletter


Related:

  • High-Severity Cisco DoS Flaw Can Immobilize ASR Routers

    November 11, 2020

    A high-severity flaw in Cisco’s IOS XR software could allow unauthenticated, remote attackers to cripple Cisco Aggregation Services Routers (ASR). The flaw stems from Cisco IOS XR, a train of Cisco Systems’ widely deployed Internetworking Operating System (IOS). The OS powers the Cisco ASR 9000 series, which are fully distributed routers engineered to address massive surges ...

  • CVE-2020-17051: Remote kernel heap overflow in NFSv3 Windows Server

    November 10, 2020

    Microsoft released a patch today for a critical vulnerability (CVE-2020-17051) in the Windows NFSv3 (Network File System) server. NFS is typically used in heterogenous environments of Windows and Unix/Linux for file sharing. The vulnerability can be reproduced to cause an immediate BSOD (Blue Screen of Death) within the nfssvr.sys driver. Interestingly, the November patches from ...

  • Microsoft Patch Tuesday Update Fixes 17 Critical Bugs

    November 10, 2020

    Microsoft’s November Patch Tuesday roundup of security fixes tackled an unusually large crop of remote code execution (RCE) bugs. Twelve of Microsoft’s 17 critical patches were tied to RCE bugs. In all, 112 vulnerabilities were patched by Microsoft, with 93 rated important, and two rated low in severity. Tracked as CVE-2020-17087, one Windows kernel local elevation ...

  • New Platypus attack can steal data from Intel CPUs

    November 10, 2020

    A team of academics has disclosed today a new attack method that can extract data from Intel CPUs. Named Platypus, an acronym for “Power Leakage Attacks: Targeting Your Protected User Secrets,” the attack targets the RAPL interface of Intel processors. RAPL, which stands for Running Average Power Limit, is a component that allows firmware or software applications ...

  • New Slipstream NAT bypass attacks to be blocked by browsers

    November 9, 2020

    Web browser vendors are planning to block a new attack technique that would allow attackers to bypass a victim’s NAT, firewall, or router to gain access to any TCP/UDP service hosted on their devices. The attack method, dubbed NAT Slipstreaming, was discovered by security researcher Samy Kamkar and it requires the victims to visit the threat ...

  • Apple Patches Bugs Tied to Previously Identified Zero-Days

    November 6, 2020

    Apple has patched three previously identified zero-day vulnerabilities in its iPhone, iPod and iPad devices potentially related to a spate of related flaws recently discovered by the Google Project Zero team that also affect Google Chrome and Windows. Apple this week released iOS 14.2 and iPadOS 14.2, which patch a total of 24 vulnerabilities—including the three ...