The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.
Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.
Read more…
Source: Sonicwall
Related:
- CISA: Nation-State Attackers Likely to Take Aim at Palo Alto Networks Bug
June 30, 2020
The U.S. Cybersecurity and Infrastructure Security Agency (CISA) is warning that foreign hackers are likely to exploit a newly disclosed, critical vulnerability in a raft of Palo Alto Networks firewalls and enterprise VPN appliances, which allows for device takeover without authentication. The Department of Defense (DoD) arm that oversees cyberspace operations has advised all devices affected ...
- 80,000 printers are exposing their IPP port online
June 23, 2020
For years, security researchers have warned that every device left exposed online without being protected by a firewall is an attack surface. Hackers can deploy exploits to forcibly take control over the device, or they can just connect to the exposed port if no authentication is required. Devices hacked this way are often enslaved in malware botnets, ...
- Ripple20 Vulnerability Mitigation Best Practices
June 22, 2020
On June 16th, the Department of Homeland Security and CISA ICS-CERT issued a critical security advisory warning covering multiple newly discovered vulnerabilities affecting Internet-connected devices manufactured by multiple vendors. This set of 19 vulnerabilities in a low-level TCP/IP software library developed by Treck has been dubbed “Ripple20” by researchers from JSOF. A networking stack is a software component that provides ...
- Australian PM says nation under serious state-run ‘cyber attack’ – Microsoft, Citrix, Telerik UI bugs ‘exploited’
June 19, 2020
Australian Prime Minister Scott Morrison has called a snap press conference to reveal that the nation is under cyber-attack by a state-based actor, but the nation’s infosec advice agency says that while the attacker has gained access to some systems it has not conducted “any disruptive or destructive activities within victim environments.” Morrison said the attack ...
- AcidBox: Rare Malware Repurposing Turla Group Exploit Targeted Russian Organizations
June 17, 2020
When the news broke in 2014 about a new sophisticated threat actor dubbed the Turla Group, which the Estonian foreign intelligence service believes has Russian origins and operates on behalf of the FSB, its kernelmode malware also became the first publicly-described case that abused a third-party device driver to disable Driver Signature Enforcement (DSE). This security mechanism was introduced in Windows Vista ...
- Ripple20 vulnerabilities will haunt the IoT landscape for years to come
June 16, 2020
Cyber-security experts have revealed today 19 vulnerabilities in a small library designed in the 90s that has been widely used and integrated into countless of enterprise and consumer-grade products over the last 20+ years. The number if impacted products is estimated at “hundreds of millions” and includes products such as smart home devices, power grid equipment, ...
