Critical Path Traversal Vulnerability in Check Point Security Gateways (CVE-2024-24919)


The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.

Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.

Read more…
Source: Sonicwall


Sign up for our Newsletter


Related:

  • Windows 0-day exploit CVE-2019-1458 used in Operation WizardOpium

    December 11, 2019

    In November 2019, Kaspersky technologies successfully detected a Google Chrome 0-day exploit that was used in Operation WizardOpium attacks. During our investigation, we discovered that yet another 0-day exploit was used in those attacks. The exploit for Google Chrome embeds a 0-day EoP exploit (CVE-2019-1458) that is used to gain higher privileges on the infected machine as ...

  • New Plundervolt attack impacts Intel CPUs

    December 10, 2019

    Academics from three universities across Europe have disclosed today a new attack that impacts the integrity of data stored inside Intel SGX, a highly-secured area of Intel CPUs. The attack, which researchers have named Plundervolt, exploits the interface through which an operating system can control an Intel processor’s voltage and frequency — the same interface that allows ...

  • OpenBSD Hit with Authentication, LPE Bugs

    December 5, 2019

    An authentication bypass and three local privilege-escalation (LPE) bugs have been uncovered in OpenBSD, the Unix-like open-source operating system known for its security protections. The most severe of the vulnerabilities is the bypass (CVE-2019-19521), which is remotely exploitable. OpenBSD uses BSD authentication, which enables the use of passwords, S/Key challenge-and-response authentication and Yubico YubiKey tokens. In each ...

  • New vulnerability lets attackers sniff or hijack VPN connections

    December 5, 2019

    Academics have disclosed this week a security flaw impacting Linux, Android, macOS, and other Unix-based operating systems that allows an attacker to sniff, hijack, and tamper with VPN-tunneled connections. The vulnerability — tracked as CVE-2019-14899 — resides in the networking stacks of multiple Unix-based operating systems, and more specifically, in how the operating systems reply to ...

  • FBI warns about snoopy smart TVs spying on you

    December 3, 2019

    She laughed. I laughed. The TV laughed. I shot the TV. “Blasted Decepticons!” That’s how a popular meme went after the Transformer movies hit it big. Today, it’s not so funny. A recent FBI report warned smart TV users that hackers can also take control of your unsecured TV. “At the low end of the risk spectrum, they can ...

  • Android: New StrandHogg vulnerability is being exploited in the wild

    December 2, 2019

    Security researchers from Promon, a Norwegian firm specialized in in-app security protections, said they identified a bug in the Android operating system that lets malicious apps hijack legitimate app, and perform malicious operations on their behalf. In a comprehensive report published today, the research team said the vulnerability can be used to trick users into granting intrusive permissions ...