Exploitation of critical path traversal vulnerability (CVE-2024-41713) and 0-day path traversal vulnerability (CVE-2024-55550) in Mitel MiCollab


After proof-of-concept technical details were published on 5 December 2024 for CVE-2024-41713 and CVE-2024-55550, exploitation activity chaining these two Mitel MiCollab vulnerabilities has been reported.

MiCollab is a cloud-based platform that integrates chat, voice, video, and SMS messaging for teams. Vulnerability details CVE-2024-41713 is a vulnerability in the NuPoint Unified Messaging (NPM) component of Mitel MiCollab and has a CVSSv3 score of 9.8.

Read more…
Source: NHS Digital


Sign up for our Newsletter


Related:

  • APT10: sophisticated multi-layered loader Ecipekac discovered in A41APT campaign

    March 30, 2021

    In 2019, we observed an APT campaign targeting multiple industries, including the Japanese manufacturing industry and its overseas operations, that was designed to steal information. We named the campaign A41APT (not APT41) which is derived from the host name “DESKTOP-A41UVJV” from the attacker’s system used in the initial infection. The actor leveraged vulnerabilities in Pulse ...

  • Newly-Discovered Vulnerabilities Could Allow for Bypass of Spectre Mitigations in Linux

    March 29, 2021

    Two new vulnerabilities have been patched in the Linux kernel which, if exploited, could bypass existing mitigations for the Spectre vulnerabilities. The vulnerabilities were discovered by Piotr Krysiuk, a researcher on Symantec’s Threat Hunter team, who reported them to the Linux kernel security team. If left unpatched, the vulnerabilities mean that existing Spectre protections will ...

  • Critical netmask networking bug impacts thousands of applications

    March 28, 2021

    Popular npm library netmask has a critical networking vulnerability. Netmask is frequently used by hundreds of thousands of applications to parse IPv4 addresses and CIDR blocks or compare them. The component gets over 3 million weekly downloads, and as of today, has scored over 238 million total downloads over its lifetime. Further, about 278,000 GitHub repositories depend ...

  • Apple releases emergency update for iPhones, iPads, and Apple Watch

    March 27, 2021

    Apple has released an emergency update to patch a serious vulnerability (https://support.apple.com/en-us/HT212258) found in iOS, iPadOS, and watchOS. The patches are iOS 14.4.2, iPadOS 14.4.2, and watchOS 7.3.3, respectively. The vulnerability, discovered by Google’s Threat Analysis Group, affects Apple’s WebKit browser engine, and what makes this an urgent update is the fact that the Apple claims that ...

  • The security dilemma of smart factories [Part 1] Specificity of the programming languages used to move industrial robots

    March 26, 2021

    Industrial robots are the core of the automation of manufacturing processes in smart factories, and are the most important components as they support the manufacture of all kinds of products such as automobiles, aircraft, processed foods, and pharmaceuticals. In addition, as equipment that realizes unmanned manufacturing in the post-COVID-19 world where minimal or no contact ...

  • Microsoft Exchange servers now targeted by Black Kingdom ransomware

    March 22, 2021

    Another ransomware operation known as ‘Black Kingdom’ is exploiting the Microsoft Exchange Server ProxyLogon vulnerabilities to encrypt servers. Over the weekend, security researcher Marcus Hutchins, aka MalwareTechBlog, tweeted that a threat actor was compromising Microsoft Exchange servers via the ProxyLogon vulnerabilities to deploy ransomware. Based on the logs from his honeypots, Hutchins states that the threat actor ...