Exploitation of critical path traversal vulnerability (CVE-2024-41713) and 0-day path traversal vulnerability (CVE-2024-55550) in Mitel MiCollab


After proof-of-concept technical details were published on 5 December 2024 for CVE-2024-41713 and CVE-2024-55550, exploitation activity chaining these two Mitel MiCollab vulnerabilities has been reported.

MiCollab is a cloud-based platform that integrates chat, voice, video, and SMS messaging for teams. Vulnerability details CVE-2024-41713 is a vulnerability in the NuPoint Unified Messaging (NPM) component of Mitel MiCollab and has a CVSSv3 score of 9.8.

Read more…
Source: NHS Digital


Sign up for our Newsletter


Related:

  • Kubernetes Vulnerability Puts Clusters at Risk of Takeover (CVE-2020-8558)

    July 27, 2020

    A security issue assigned CVE-2020-8558 was recently discovered in the kube-proxy, a networking component running on Kubernetes nodes. The issue exposed internal services of Kubernetes nodes, often run without authentication. On certain Kubernetes deployments, this could have exposed the api-server, allowing an unauthenticated attacker to gain complete control over the cluster. An attacker with this ...

  • NSA Urgently Warns on Industrial Cyberattacks, Triconex Critical Bug

    July 24, 2020

    The U.S. National Security Agency (NSA) and the Cybersecurity and Infrastructure Security Agency (CISA) have issued an alert warning that adversaries could be targeting critical infrastructure across the U.S. Separately, ICS-CERT issued an advisory on a critical security bug in the Schneider Electric Triconex TriStation and Tricon Communication Module. These safety instrumented system (SIS) controllers are ...

  • Threat Brief: Microsoft DNS Server Wormable Vulnerability CVE-2020-1350

    July 21, 2020

    In July 2020, Microsoft released a security update, CVE-2020-1350 | Windows DNS Server Remote Code Execution Vulnerability, for a new remote code execution (RCE) vulnerability. This vulnerability exists within the Microsoft Windows Domain Name System (DNS) Server due to the improper handling of certain types of requests, specifically over port 53/TCP. Exploitation of this vulnerability is ...

  • BadPower attack corrupts fast chargers to melt or set your device on fire

    July 20, 2020

    Chinese security researchers said they can alter the firmware of fast chargers to cause damage to connected (charging) systems, such as melt components, or even set devices on fire. The technique, named BadPower, was detailed last week in a report published by Xuanwu Lab, a research unit of Chinese tech giant Tencent. According to researchers, BadPower works ...

  • Windows 10 Store ‘wsreset’ tool lets attackers bypass antivirus

    July 20, 2020

    A technique that exploits Windows 10 Microsoft Store called ‘wsreset.exe’ can delete bypass antivirus protection on a host without being detected. Wsreset.exe is a legitimate troubleshooting tool that lets users diagnose problems with the Windows Store and reset its cache. Pentester and researcher Daniel Gebert has discovered that wsreset.exe can be abused to delete arbitrary files. As wsreset.exe ...

  • Thousands of Vulnerable F5 BIG-IP Users Still Open to Takeover

    July 17, 2020

    About 8,000 users of F5 Networks’ BIG-IP family of networking devices are still vulnerable to full system access and remote code-execution (RCE), despite a patch for a critical flaw being available for two weeks. The BIG-IP family consists of application delivery controllers, Local Traffic Managers (LTMs) and domain name system (DNS) managers, together offering built-in security, ...