Exploitation of critical path traversal vulnerability (CVE-2024-41713) and 0-day path traversal vulnerability (CVE-2024-55550) in Mitel MiCollab


After proof-of-concept technical details were published on 5 December 2024 for CVE-2024-41713 and CVE-2024-55550, exploitation activity chaining these two Mitel MiCollab vulnerabilities has been reported.

MiCollab is a cloud-based platform that integrates chat, voice, video, and SMS messaging for teams. Vulnerability details CVE-2024-41713 is a vulnerability in the NuPoint Unified Messaging (NPM) component of Mitel MiCollab and has a CVSSv3 score of 9.8.

Read more…
Source: NHS Digital


Sign up for our Newsletter


Related:

  • New CSS Attack Restarts an iPhone or Freezes a Mac

    September 15, 2018

    A new attack has been discovered that will cause iOS to restart or respring and macOS to freeze simply by visiting a web page that contains certain CSS & HTML. Windows and Linux users are not affected by this bug. This new attack was discovered by Sabri Haddouche, a security researcher at Wire, who was able to devise a ...

  • Schneider Electric Modicon vulnerability impacts ICS operation in industrial settings

    September 6, 2018

    A security vulnerability discovered in Schneider Electric Modicon controllers has the potential to severely disrupt industrial equipment and networks. According to researchers from industrial cybersecurity firm Radiflow, the bug, tracked as CVE-2018-7789, “severely exposes the safety and availability of the ICS networks on which these devices were installed.” The vulnerability is present in the Schneider Electric Modicon M221 controller ...

  • Recent Windows ALPC zero-day has been exploited in the wild for almost a week

    September 5, 2018

    Two days after a security researcher released details and proof-of-concept code about an unpatched Windows zero-day, one malware group had already incorporated the vulnerability in their exploit chain and was attempting to infect users around the globe. The zero-day used in this malware distribution campaign is a (still-unpatched) vulnerability in the Windows Task Scheduler feature, affecting ...

  • Active Campaign Exploits Critical Apache Struts 2 Flaw in the Wild

    September 5, 2018

    A Monero cryptomining script is spreading in an ongoing campaign using the recently disclosed critical remote command-execution flaw. It was only a matter of time before attacks were seen in the wild, and now it’s happened. A known threat actor has mounted a large cryptomining campaign using the recently disclosed Apache Struts 2 critical remote code-execution ...

  • Thousands of MikroTik Routers Hacked to Eavesdrop On Network Traffic

    September 3, 2018

    Last month we reported about a widespread crypto-mining malware campaign that hijacked over 200,000 MikroTik routers using a previously disclosed vulnerability revealed in the CIA Vault 7 leaks. Now Chinese security researchers at Qihoo 360 Netlab have discovered that out of 370,000 potentially vulnerable MikroTik routers, more than 7,500 devices have been compromised to enable Socks4 proxy maliciously, allowing attackers to ...

  • Microsoft Windows zero-day vulnerability disclosed through Twitter

    August 28, 2018

    Microsoft has quickly reacted to the disclosure of a previously unknown zero-day vulnerability in the Windows operating system. On Monday, Twitter user SandboxEscaper revealed the existence of the bug on the microblogging platform. As reported by the Register, the user said: “Here is the alpc bug as 0day. I don’t f**king care about life anymore. Neither do I ...