After proof-of-concept technical details were published on 5 December 2024 for CVE-2024-41713 and CVE-2024-55550, exploitation activity chaining these two Mitel MiCollab vulnerabilities has been reported.
MiCollab is a cloud-based platform that integrates chat, voice, video, and SMS messaging for teams. Vulnerability details CVE-2024-41713 is a vulnerability in the NuPoint Unified Messaging (NPM) component of Mitel MiCollab and has a CVSSv3 score of 9.8.
Read more…
Source: NHS Digital
Related:
- APT10: Japan-Linked Organizations Targeted in Long-Running and Sophisticated Attack Campaign
November 17, 2020
A large-scale attack campaign is targeting multiple Japanese companies, including subsidiaries located in as many as 17 regions around the globe in a likely intelligence-gathering operation. Companies in multiple sectors are targeted in this campaign, including those operating in the automotive, pharmaceutical, and engineering sector, as well as managed service providers (MSPs). The scale and sophistication of ...
- High-Severity Cisco DoS Flaw Can Immobilize ASR Routers
November 11, 2020
A high-severity flaw in Cisco’s IOS XR software could allow unauthenticated, remote attackers to cripple Cisco Aggregation Services Routers (ASR). The flaw stems from Cisco IOS XR, a train of Cisco Systems’ widely deployed Internetworking Operating System (IOS). The OS powers the Cisco ASR 9000 series, which are fully distributed routers engineered to address massive surges ...
- CVE-2020-17051: Remote kernel heap overflow in NFSv3 Windows Server
November 10, 2020
Microsoft released a patch today for a critical vulnerability (CVE-2020-17051) in the Windows NFSv3 (Network File System) server. NFS is typically used in heterogenous environments of Windows and Unix/Linux for file sharing. The vulnerability can be reproduced to cause an immediate BSOD (Blue Screen of Death) within the nfssvr.sys driver. Interestingly, the November patches from ...
- Microsoft Patch Tuesday Update Fixes 17 Critical Bugs
November 10, 2020
Microsoft’s November Patch Tuesday roundup of security fixes tackled an unusually large crop of remote code execution (RCE) bugs. Twelve of Microsoft’s 17 critical patches were tied to RCE bugs. In all, 112 vulnerabilities were patched by Microsoft, with 93 rated important, and two rated low in severity. Tracked as CVE-2020-17087, one Windows kernel local elevation ...
- New Platypus attack can steal data from Intel CPUs
November 10, 2020
A team of academics has disclosed today a new attack method that can extract data from Intel CPUs. Named Platypus, an acronym for “Power Leakage Attacks: Targeting Your Protected User Secrets,” the attack targets the RAPL interface of Intel processors. RAPL, which stands for Running Average Power Limit, is a component that allows firmware or software applications ...
- New Slipstream NAT bypass attacks to be blocked by browsers
November 9, 2020
Web browser vendors are planning to block a new attack technique that would allow attackers to bypass a victim’s NAT, firewall, or router to gain access to any TCP/UDP service hosted on their devices. The attack method, dubbed NAT Slipstreaming, was discovered by security researcher Samy Kamkar and it requires the victims to visit the threat ...
