Exploitation of critical path traversal vulnerability (CVE-2024-41713) and 0-day path traversal vulnerability (CVE-2024-55550) in Mitel MiCollab


After proof-of-concept technical details were published on 5 December 2024 for CVE-2024-41713 and CVE-2024-55550, exploitation activity chaining these two Mitel MiCollab vulnerabilities has been reported.

MiCollab is a cloud-based platform that integrates chat, voice, video, and SMS messaging for teams. Vulnerability details CVE-2024-41713 is a vulnerability in the NuPoint Unified Messaging (NPM) component of Mitel MiCollab and has a CVSSv3 score of 9.8.

Read more…
Source: NHS Digital


Sign up for our Newsletter


Related:

  • 800,000 SonicWall VPNs vulnerable to new remote code execution bug

    October 16, 2020

    Almost 800,000 internet-accessible SonicWall VPN appliances will need to be updated and patched for a major new vulnerability that was disclosed on Wednesday. Discovered by the Tripwire VERT security team, CVE-2020-5135 impacts SonicOS, the operating system running on SonicWall Network Security Appliance (NSA) devices. SonicWall NSAs are used as firewalls and SSL VPN portals to filter, control, ...

  • Microsoft Addresses Windows TCP/IP RCE/DoS Vulnerability

    October 14, 2020

    Microsoft has released a security update to address a protocol vulnerability—CVE-2020-16898—in Windows Transmission Control Protocol (TCP)/IP stack handling of Internet Control Message Protocol version 6 (ICMPv6) Router Advertisement packets. A remote attacker could exploit this vulnerability to take control of an affected system or cause a denial-of-service condition. The Cybersecurity and Infrastructure Security Agency (CISA) encourages ...

  • Google, Intel Warn on ‘Zero-Click’ Kernel Bug in Linux-Based IoT Devices

    October 14, 2020

    Google and Intel are warning of a high-severity flaw in BlueZ, the Linux Bluetooth protocol stack that provides support for core Bluetooth layers and protocols to Linux-based internet of things (IoT) devices. According to Google, the vulnerability affects users of Linux kernel versions before 5.9 that support BlueZ. BlueZ, which is an open-source project distributed under ...

  • Two New IoT Vulnerabilities Identified with Mirai Payloads

    October 14, 2020

    Palo Alto Networks is proactively trying to safeguard its customers from attacks however possible. By leveraging its Next-Generation Firewall as sensors on the perimeter to detect malicious payloads and attack patterns, Unit 42 researchers are able to hunt down the menaces out there on the network, be they known or not. Unit 42 researchers have taken ...

  • Threat Brief: Microsoft Vulnerability CVE-2020-16898

    October 14, 2020

    In October 2020, during Microsoft’s Patch Tuesday, a security update (CVE-2020-16898) addressed a critical vulnerability discovered in IPv6 Router Advertisement Options (called “DNS RA options”). This vulnerability resides within the Windows TCP/IP stack that is responsible for handling RA packets. Current exploitation leads to a Denial of Service (DoS) with the possibility of remote code ...

  • Critical Flash Player Flaw Opens Adobe Users to RCE

    October 13, 2020

    Adobe is warning of a critical vulnerability in its Flash Player application for users on Windows, macOS, Linux and ChromeOS operating systems. The vulnerability is the only flaw released this month as part of Adobe’s regularly scheduled patches (markedly less than the 18 flaws addressed during its September regularly scheduled fixes). However, it’s a critical bug ...