Critical Path Traversal Vulnerability in Check Point Security Gateways (CVE-2024-24919)


The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.

Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.

Read more…
Source: Sonicwall


Sign up for our Newsletter


Related:

  • Ghost CMS flaw hijacked to target hundreds of websites with ClickFix attacks

    May 26, 2026

    A critical-severity vulnerability that reportedly was patched three months ago is being exploited in a massive ClickFix campaign, researchers have claimed. In mid-February 2026, a critical SQL injection vulnerability was found in Ghost CMS, a popular open-source Content Management System (CMS) currently used by more than 57,000 websites, including the likes of 404 Media, The Canadian ...

  • Industrial robots targeted by malware, which could open them up to hacking

    May 25, 2026

    A critical command injection vulnerability has been discovered in Universal Robots PolyScope 5, the operating system whucg powers the company’s collaborative robots. The flaw, tracked as CVE-2026-8153, carries a CVSS score of 9.8 and affects all software versions prior to PolyScope 5.25.1. This vulnerability could lead to complete compromise of the robot controller, affecting the confidentiality, integrity, and availability ...

  • Another major Linux security flaw revealed — nine-year old issue could spell disaster for users

    May 23, 2026

    Security researchers Qualys discovered a major flaw in the Linux operating system (OS) that could let any ordinary user, or malicious actor, gain full admin access on vulnerable endpoints. This bug lingered in Linux systems since 2016, and affects the default installations of several major distributions, including Red Hat, SUSE, Debian, Fedora, AlmaLinux, CloudLinux, and others. Read more… Source:  TechRadar News Sign up ...

  • Update Chrome now: Critical bugs could let attackers run code

    May 22, 2026

    Google has issued updates for the Chrome browser patching a number of high‑severity vulnerabilities. The update includes fixes for two critical vulnerabilities that can be used for remote code execution just by visiting a malicious website. The stable channel has been updated to 148.0.7778.178/179 for Windows/Mac and 148.0.7778.178 for Linux, which will roll out over the coming weeks. Read more… Source: ...

  • Key Microsoft legacy tool is still being abused to launch malware campaigns

    May 21, 2026

    Cybercriminals are increasingly using a legitimate legacy Windows tool to deploy infostealers and loader malware, researchers are saying. A new Bitdefender report has claimed that since the start of 2026, there’s been an uptick in activity related to a Windows utility called Microsoft HTML Application Host (MSHTA), a legitimate utility that runs special HTML-based application files known as HTAs. Read more… Source:  ...

  • NGINX Rift attackers waste no time targeting exposed servers

    May 18, 2026

    Exploit attempts are already hammering a newly disclosed NGINX bug dubbed “NGINX Rift,” proving once again that attackers read patch notes faster than most admins. Researchers at VulnCheck said they are seeing active exploitation tied to CVE-2026-42945, a heap buffer overflow flaw affecting both NGINX Open Source and NGINX Plus that was disclosed last week after apparently sitting ...