The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.
Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.
Read more…
Source: Sonicwall
Related:
- Key Microsoft legacy tool is still being abused to launch malware campaigns
May 21, 2026
Cybercriminals are increasingly using a legitimate legacy Windows tool to deploy infostealers and loader malware, researchers are saying. A new Bitdefender report has claimed that since the start of 2026, there’s been an uptick in activity related to a Windows utility called Microsoft HTML Application Host (MSHTA), a legitimate utility that runs special HTML-based application files known as HTAs. Read more… Source: ...
- NGINX Rift attackers waste no time targeting exposed servers
May 18, 2026
Exploit attempts are already hammering a newly disclosed NGINX bug dubbed “NGINX Rift,” proving once again that attackers read patch notes faster than most admins. Researchers at VulnCheck said they are seeing active exploitation tied to CVE-2026-42945, a heap buffer overflow flaw affecting both NGINX Open Source and NGINX Plus that was disclosed last week after apparently sitting ...
- Chaotic Eclipse strikes again with another worrying Windows security flaw
May 18, 2026
Threat actors could escalate privileges and gain SYSTEM access on a fully patched Windows 11 device thanks to an unpatched vulnerability which allegedly should have been fixed years ago, new reports have claimed. A researcher with the alias Chaotic Eclipse recently disclosed a Proof-of-Concept (PoC) exploit for a zero-day vulnerability they named “MiniPlasma”. In a new GitHub entry, ...
- Patch time for Cisco SD-WAN admins as vendor drops yet another make-me-admin zero-day
May 15, 2026
Cisco admins face emergency patch duty after Switchzilla disclosed a max-severity make-me-admin bug affecting Catalyst SD-WAN Controller and Manager. Switchzilla dropped an advisory for CVE-2026-20182 (10.0) on Thursday, saying that both components, formerly known as vSmart and vManage, were vulnerable in all deployment types, and that fixes were available. The bug allows unauthenticated remote attackers to bypass authentication and ...
- Another major Linux security issue uncovered – new Fragnesia flaw allows attackers to run malicious code as root
May 14, 2026
Security researchers have discovered a new vulnerability in the Linux kernel which could allow malicious actors to run code with elevated privileges, exposing systems to risk of data theft, malware deployment, and even full device takeover. The vulnerability is tracked as CVE-2026-46300, and was given a severity score of 7.8/10 (high). It’s nicknamed Fragnesia and is ...
- Over a million WordPress sites hit in plugin flaw — so patch now or face the consequences
May 14, 2026
A popular WordPress plugin with roughly a million active installations contained two vulnerabilities that could have allowed malicious actors to exfiltrate sensitive data, such as password hashes and other valuable information. Security researchers at Wordfence said they were tipped off by a researcher Rafie Muhammad about the existence of an Arbitrary File Read and an SQL Injection vulnerability in Avada ...
