Critical Path Traversal Vulnerability in Check Point Security Gateways (CVE-2024-24919)


The SonicWall Capture Labs threat research team became aware of an exploited-in-the-wild information disclosure vulnerability affecting the Check Point Security Gateways.

Identified as CVE-2024-24919 and given a CVSSv3 score of 8.6, the vulnerability is more severe than it initially appears. While labeled as a sensitive information disclosure vulnerability, it is actually a path traversal attack leading to an arbitrary read, allowing an attacker to read any file on the system. A proof of concept is publicly available on GitHub. To be vulnerable, the gateway needs to have Remote Access VPN or Mobile Access Software Blades enabled. Check Point has made a patch available, and it is advisable to update immediately.

Read more…
Source: Sonicwall


Sign up for our Newsletter


Related:

  • PhantomRPC: A new privilege escalation technique in Windows Remote Procedure Call

    April 24, 2026

    Windows Interprocess Communication (IPC) is one of the most complex technologies within the Windows operating system. At the core of this ecosystem is the Remote Procedure Call (RPC) mechanism, which can function as a standalone communication channel or as the underlying transport layer for more advanced interprocess communication technologies. Because of its complexity and widespread ...

  • Apple fixes iOS bug that kept deleted notifications, including chat previews

    April 23, 2026

    Apple has released a software update that deals with an issue that could allow deleted notifications to be retrieved. Something that, in at least one reported case, was used by law enforcement during forensic analysis. Apple fixed the issue in iOS and iPadOS versions 18.7.8 and 26.4.2 (check availability for your device at those links). The ...

  • Iran claims US used backdoors to knock out networking equipment during war

    April 21, 2026

    Iranian media is claiming that the US used backdoors and/or botnets to disable networking equipment during the current war, and Chinese state media is dining out on the allegations. Reports from Iran claim hardware made by Cisco, Juniper, Fortinet, and MikroTik either rebooted or disconnected during recent attacks on Iran – despite the regime disconnecting the ...

  • Microsoft releases Windows Server update fix to fix its April update fixes

    April 20, 2026

    Microsoft has pushed out an out-of-band update to address the restart loop that hit some Windows Server devices after its April update. The fix will spare administrators the headache of forced server restarts after installing the April 2026 update. (A reminder that deploying any Microsoft update directly to production without thorough testing is, to put it ...

  • NIST changes enrichment process for National Vulnerability Database due to surge in CVE submissions

    April 20, 2026

    The number of reported vulnerabilities has surged so sharply that it forced the National Institute of Standards and Technology (NIST) to change how it ‘enriches’ each entry. Until now, NIST would take a basic CVE record and add structured analysis, to make it more useful in the National Vulnerability Database (NVD). That usually includes severity scoring ...

  • Tracking Mirai Variant Nexcorium: A Vulnerability-Driven IoT Botnet Campaign

    April 17, 2026

    IoT devices are increasingly prime targets for large-scale attacks due to their widespread use, lack of patching, and often weak security settings. Threat actors continue exploiting known vulnerabilities to gain initial access and deploy malware that can persist, spread, and cause distributed denial-of-service (DDoS) attacks. FortiGuard Labs has analyzed a recent campaign exploiting CVE-2024-3721 in TBK ...